In the AAC production line, this machine is used in the pouring and pre-curing section during slurry discharge from the mixer into the mould. Its function is to remove bubbles generated or carried during the pouring process so that the slurry condition in the mould can be improved before the next stage. Because it works at the point of mould filling, it is closely related to the pouring operation rather than to later cutting or curing processes. It is arranged with the related equipment and transfer steps in the pouring and pre-curing section.
In the AAC production line, this machine is used in the pouring and pre-curing section during slurry discharge from the mixer into the mould. Its function is to remove bubbles generated or carried during the pouring process so that the slurry condition in the mould can be improved before the next stage. Because it works at the point of mould filling, it is closely related to the pouring operation rather than to later cutting or curing processes. It is arranged with the related equipment and transfer steps in the pouring and pre-curing section.
During mould filling, the high speed bubble removing machine acts on the slurry as it is being poured from the mixer into the mould, removing bubbles in this stage of the process.
The machine is used in AAC production during the pouring operation where slurry is transferred into the mould. It is suitable for production lines that include a bubble-removal step during mixer-to-mould transfer in the pouring and pre-curing section. It can be used in AAC production layouts that follow the same process route, material handling sequence, and operating arrangement.
Empower Every Teeyer, Make Teeyer Renowned Globally!