Pin-inserting/drawing out hoister is used for transporting the frame with steel mesh.
The assembled steel frame or steel cage is inserted into the mold and then pulled out of the mold by the hoister. The accuracy of the hoister will affect the cage or mesh position in the mould, it can realize the rapid rotation and accurate positioning of the steel mesh assembled in the production process of aerated concrete. It is an important equipment in the AAC panel production process. Its equipment state and operation accuracy directly affect the production efficiency and product qualification rate of aerated concrete panel.